What Is a Construction Submittal?

Submittals are one of the most misunderstood parts of the construction process. Here is a plain-language explanation of what they are, why they exist, and how the submittal workflow actually runs on a real project.

· 8 min read

If you have worked in construction for any length of time, you have dealt with submittals. You have probably also encountered the confusion, delays, and disputes that arise when the submittal process is poorly managed. But despite how central submittals are to every commercial, institutional, and industrial construction project, the process is rarely explained clearly — even to people who are responsible for managing it. This article explains what a construction submittal actually is, why the submittal process exists, what types of submittals appear on a typical project, and how the review workflow is supposed to function. Understanding the fundamentals is the starting point for managing submittals effectively.

The Definition: What a Submittal Actually Is

A construction submittal is a document, sample, or other physical item that a contractor or subcontractor provides to the design team for review and approval before the corresponding material, product, or system is fabricated, procured, or installed. The submittal is the contractor's way of demonstrating that what they plan to use or build conforms to the requirements of the contract documents — the drawings and specifications. A submittal is not a change to the design. It is a confirmation that the contractor has read and understood the design requirements and is planning to provide something that meets them. The design team's review of a submittal is not a re-design exercise. It is a check that the contractor's proposed product, material, or fabrication approach is consistent with design intent. This distinction matters because it defines the limits of liability on both sides: the contractor is responsible for means, methods, and the accuracy of the submittal; the design professional is responsible for confirming general conformance with the design documents.

Why the Submittal Process Exists

The submittal process exists because construction drawings and specifications cannot — and should not — prescribe every detail of every product and system in advance. Specifications typically define performance requirements, acceptable manufacturers, physical constraints, and quality standards, but they deliberately leave room for the contractor to select a specific product model, prepare shop drawings that show exactly how a system will be built, and coordinate between trades in ways that are not fully resolved at the design stage. Without a formal review process, contractors could install products that meet only the literal specification language while missing the design intent, or fabricate elements that conflict with adjacent systems because the shop drawings were never checked against the structural or mechanical drawings. The submittal process provides a structured mechanism for catching these problems before they become field problems. A missed coordination issue discovered during submittal review costs a few hours of time. The same issue discovered after installation can cost tens of thousands of dollars in rework.

Common Types of Submittals

Product data submittals are the most common type on a typical commercial project. These are manufacturer's cut sheets, technical data sheets, and product literature that the contractor submits to demonstrate that the proposed product meets specification requirements. A contractor installing HVAC equipment, plumbing fixtures, roofing membranes, or electrical switchgear will typically submit product data for each item. Shop drawings are contractor-prepared drawings that show in detail how a specific component will be fabricated or installed. Structural steel connections, precast concrete elements, curtain wall systems, custom millwork, mechanical ductwork, and prefabricated assemblies all typically require shop drawing submittals. Shop drawings must be checked not only against the specifications but also against the architectural and engineering drawings for dimensional accuracy and coordination. Samples are physical examples of a proposed material or finish — tile, paint, carpet, stone, or brick — submitted for the design team's review and approval before the material is ordered in quantity. Calculations are engineering analyses submitted to demonstrate that a structural, mechanical, electrical, or civil system meets specified performance criteria. Certifications, test reports, and quality documentation are submitted to verify that products meet referenced standards — fire ratings, energy efficiency certifications, structural test results, and similar requirements.

How the Submittal Workflow Is Supposed to Run

The standard submittal workflow begins with the contractor developing a submittal log — a complete list of every submittal required by the contract documents, organized by specification section. This log is typically prepared at project kick-off and submitted to the design team for review and agreement. Once the log is established, the contractor prepares and submits each item by its required date, which is determined by the procurement and construction schedule: a product with a 16-week manufacturing lead time must have its submittal approved well in advance of when the material needs to be on-site. Each submittal is transmitted with a cover transmittal that identifies the specification section, the submittal type, the item number from the log, and the date. The design team reviews the submittal and returns it with one of four standard actions: Approved, meaning the submittal conforms to the contract documents and the material may proceed; Approved as Noted, meaning the submittal is acceptable subject to specific comments that must be incorporated; Revise and Resubmit, meaning the submittal has identified deficiencies that require correction and resubmission before approval; or Rejected, meaning the submittal does not conform to the contract documents and a fundamentally different submission is required. The contractor incorporates any required revisions, resubmits if necessary, and once an approval action is received, proceeds with procurement, fabrication, or installation.

What the Specification Section Governs

Every submittal is tied to a specific section of the project specifications. In North American commercial construction, specifications are organized by the MasterFormat system developed by the Construction Specifications Institute, which divides the work into numbered divisions and sections. Division 03 covers concrete, Division 05 covers metals, Division 07 covers thermal and moisture protection, Division 22 covers plumbing, and so on. Each specification section includes a submittal paragraph that lists exactly which items the contractor must submit for review — product data, shop drawings, samples, certifications, and any special documentation required for that section. Understanding the specification's submittal requirements is essential to building a complete submittal log and ensuring that nothing is missed. A common source of delays on projects is a contractor who submits only product data when the specification also requires shop drawings, or who submits the general contractor's cover transmittal without the required certification documents from the subcontractor.

Submittal Review Time and Schedule Impact

One of the most significant causes of construction delays is submittal review time that is not properly accounted for in the schedule. Standard contract documents typically allow the architect or engineer a review period of 10 to 21 calendar days per submittal, not counting time in transit, time for the general contractor to compile the package, or time required for consultant sub-review. On complex submittals involving multiple design disciplines — an integrated mechanical, electrical, and structural system, for example — review may involve three or four separate professionals, and the total elapsed time from submission to final approval can easily exceed six weeks. If a product with a 14-week manufacturing lead time also requires six weeks for submittal review, the effective procurement window is 20 weeks from project start. On a project with a 52-week schedule, that means certain submittals must be initiated in the first two weeks of construction. Contractors who treat the submittal process as a mid-project administrative task — rather than a front-loaded procurement management process — routinely find themselves requesting expedited reviews, rushing fabrication, paying premium freight costs, and ultimately delaying the schedule regardless.

Why a Proper Submittal Log Matters

A well-maintained submittal log is the foundation of an effective submittal process. The log tracks every required submittal by number, specification section, type, submitter, date submitted, current review status, date returned, review action, and any resubmittal history. It is a live document — updated every time a submittal is transmitted or returned — and it should be reviewed at every project meeting to identify submittals that are approaching critical dates, submittals that have been returned with resubmittal requirements, and submittals that have not been initiated by their required date. Without a current, accurate submittal log, the project team is essentially managing a major procurement and review process from memory. For projects with 100, 200, or 500 required submittals — which is typical for medium to large commercial projects — that is not a sustainable approach. Dedicated submittal tracking software keeps every item current, surfaces items that are overdue or at risk, and gives the entire project team visibility into the status of every required approval. PlanSpan's submittal tracking tools are designed specifically for this purpose, giving contractors and project managers a structured, searchable log that connects to the rest of the project record.

The Relationship Between Submittals and Project Quality

The submittal process is ultimately a quality management tool. When it functions well — when submittals are prepared thoroughly, submitted on schedule, reviewed carefully, and tracked to resolution — the result is a project where installed materials and systems match the design intent, field crews have approved shop drawings to work from, and the project closeout documentation is complete. When the process breaks down — when submittals are submitted late, reviewed incompletely, or tracked informally — the result is field installations that may not conform to the specifications, disputes at project closeout about whether materials were approved, warranty claims that are complicated by missing certifications, and costly rework. Construction projects that invest in rigorous submittal management consistently perform better on quality metrics. The administrative cost of a well-run submittal process is small compared to the cost of even a single significant field installation error that results from an inadequate or bypassed review.