Skip to content
Resource Centre

Articles

Practical guidance on RFIs, submittals and project records

Featured · 5 min read

What Is an RFI in Construction? Definition, Examples and What to Include

An RFI is how a contractor asks the design team to clarify the contract documents. Here is what an RFI is for, who sends it, what a good one contains, and what it is not for.

Read article

November 18, 2026 · 4 min read

How to Write a Clear Construction RFI (With Examples)

Most slow RFI answers start with a vague question. Here is how to write an RFI the design team can answer in one pass: one question, exact references, a proposed answer and a real due date.

November 18, 2026 · 4 min read

RFI Log: What to Track on Every Construction Project

An RFI log is only useful if it shows what is holding up work. Here are the columns every construction RFI log needs, how to measure turnaround, and how to use the log in weekly meetings.

November 18, 2026 · 3 min read

Construction Submittal Review Checklist: What to Check Before You Submit or Approve

A practical checklist for reviewing construction submittals, for the contractor before sending a package and for the consultant before returning it, so fewer submittals come back for resubmission.

November 18, 2026 · 3 min read

Submittal vs Shop Drawing: What's the Difference?

Every shop drawing is a submittal, but not every submittal is a shop drawing. Here is how shop drawings differ from product data, samples and other submittals, and why the difference matters for review.

November 18, 2026 · 3 min read

How to Build a Construction Submittal Schedule from Lead Times

Late submittals are one of the most common causes of procurement delays. Here is how to work each submittal date backwards from the installation date, with an example and the allowances most teams forget.

August 2, 2026 · 9 min read

Agentic Workflows in Construction Management: What Changes When AI Can Take Action

Construction AI is moving beyond chat and summaries. Agentic workflows can investigate project records, choose the right tools, complete multi-step tasks, and return review-ready work.

August 2, 2026 · 8 min read

From Daily Report to RFI: A Step-by-Step Agentic Workflow for Construction Teams

A field issue should not lose context while becoming an RFI. This step-by-step example shows how a construction AI agent can investigate the record, draft the RFI, and preserve human review.

July 28, 2026 · 8 min read

What Is a Construction Submittal?

Submittals are one of the most misunderstood parts of the construction process. Here is a plain-language explanation of what they are, why they exist, and how the submittal workflow actually runs on a real project.

July 28, 2026 · 8 min read

RFI vs Submittal: Key Differences Every Construction Professional Should Know

RFIs and submittals are both formal document processes on construction projects, and both are frequently misused, confused, or poorly managed. Understanding the difference — and when to use each — matters more than most people realize.

July 28, 2026 · 9 min read

Common Reasons Submittals Are Rejected — and How to Avoid Them

A rejected submittal can cost a project weeks and thousands of dollars. Most rejections are preventable. Here are the patterns that experienced project teams have learned to watch for — and what to do about them.

June 23, 2026 · 9 min read

Why RFI Response Times Are Getting Longer — and What Automation Can Do About It

RFI cycle times on mid-size commercial projects now routinely exceed two weeks. The problem isn't a lack of effort — it's a workflow built on manual search, email chains, and disconnected document sets. Here's how automation changes the math.

June 23, 2026 · 10 min read

The First-Pass Submittal Review Problem: How AI Is Changing What Gets Caught Early

The most expensive submittal mistakes aren't caught late — they were never caught in the first pass. AI-assisted review is changing what gets found before materials are fabricated or delivered to site.

June 23, 2026 · 8 min read

Closed-Loop RFI Management: A Practical Guide to Resolving Field Questions Faster

Most RFI problems aren't caused by slow reviewers — they're caused by a process with no feedback loop. Here's how to build a closed-loop system that tracks every field question from identification to resolution.

June 22, 2026 · 15 min read

Agentic AI in Construction: From Project Assistants to Digital Coworkers

The first wave of AI helped construction teams answer questions. The next wave will act on them. Here's how agentic AI could reshape project coordination — and what it means for the people leading projects.

June 22, 2026 · 8 min read

Drafting RFIs and Submittal Responses with AI

AI can search thousands of pages, find related records, and produce clear first drafts in a fraction of the time. Here's how to use it on RFIs and submittals without giving up professional judgment.

June 19, 2026 · 10 min read

How AI Is Changing Construction Management in 2026

From automated reporting and predictive risk management to AI-powered scheduling and contract review, artificial intelligence is reshaping how construction projects are delivered — and the firms embracing it now are pulling ahead.

June 19, 2026 · 9 min read

From Field Notes to AI Insights: The Evolution of Construction Reporting

Construction reporting has always been the backbone of project documentation. AI is turning that backbone into a real-time intelligence system — one that doesn't just record what happened, but helps teams understand what's coming next.

June 19, 2026 · 8 min read

The Hidden Cost of Poor Construction Documentation

Poor documentation rarely shows up as a line item in a project budget — but disputes, rework, productivity losses, and safety gaps all trace back to it. Here's what incomplete records are actually costing your projects.

June 19, 2026 · 11 min read

AI vs Human Project Managers: What Will Change?

AI will automate documentation, accelerate document search, and sharpen risk forecasting. But leadership, judgment, negotiation, and field reality will remain entirely human. Here's how the construction PM role is changing — and what skills will matter most.

June 19, 2026 · 12 min read

How AI Is Used in Major Construction Projects: Case Studies

From Intel semiconductor fabs and airport expansions to hyperscale data centers and rail infrastructure, AI is already delivering measurable results on complex projects. Here's what construction managers can learn from the real-world implementations.

June 19, 2026 · 10 min read

The Major Infrastructure Projects Reshaping Canada Right Now

Canada's $343 billion infrastructure pipeline — from Toronto's Ontario Line and Montréal's REM to Darlington's small modular reactor — is one of the largest buildouts in the country's modern history. Here's what's underway and what it means for the construction industry.

April 28, 2026 · 6 min read

Why Daily Site Reports Are Your Best Defense in a Construction Dispute

Disputes over delays, scope changes, and unpaid invoices are a fact of life in construction. Find out why a consistent daily reporting habit is the cheapest insurance you'll ever buy.

April 21, 2026 · 5 min read

The Real Cost of Paper-Based Daily Reports (And How to Fix It)

Paper reports feel free, but between the time lost writing them, transcribing them, and filing them, they're quietly draining thousands of dollars from every project.

April 14, 2026 · 7 min read

What Should Be in a Construction Daily Report? A Complete Checklist

Not all daily reports are created equal. Here's exactly what to include — and why each item matters — to create a record that's useful, professional, and legally defensible.

April 7, 2026 · 6 min read

How AI Is Changing Construction Documentation — Without Replacing the Superintendent

AI tools are reshaping how daily reports, summaries, and project records get created. Here's what's actually useful on a real job site, and what's still just hype.

March 31, 2026 · 5 min read

From Daily Log to Invoice: How Foremen Are Speeding Up Billing on Commercial Projects

Slow billing is one of the biggest cash flow killers in construction. Here's how connecting your daily site records to your invoicing process can cut weeks off your payment cycle.