Construction RFI Software That Helps You RespondNot Just Track

Auto-number every RFI, assign priority and due dates, reference drawings and spec sections, and let AI draft the response from your uploaded project documents — all in one log your whole team can see.

Free plan, no credit card required Nothing is sent without your review

The RFI Problem on Every Job

RFIs Get Lost in Email

Managing RFIs through email chains means missed responses, no audit trail, and no easy way to see what's open, overdue, or already answered.

Responses Take Too Long

Finding the right spec section, drawing revision, and prior decisions before you can write a single sentence takes hours — while field work waits.

No Visibility on Open Items

Which RFIs are overdue? Which are blocking critical path? Without a proper log, nobody knows until schedule impact has already accumulated.

A Complete RFI Workflow — Create to Close

Every RFI in PlanSpan follows a structured workflow with clear status at every stage — so nothing sits unanswered and every decision has a paper trail.

1

Create

Log the field question with auto-assigned RFI number, from/to contacts, drawing reference, spec section, and priority level.

2

Assign

Route the RFI to the responsible party — architect, engineer, or owner. Set a due date and priority so the response timeline is explicit.

3

Answer

AI searches your uploaded drawings and specifications to draft a cited response. You review, adjust if needed, and issue the official answer.

4

Close

Mark the RFI closed once the response is issued and the field team has what they need. Full response history is retained for the project record.

Everything You Need to Manage RFIs Properly

PlanSpan gives construction teams a complete RFI process — numbered, tracked and answered from the project documents — without a long rollout.

Auto-Numbered RFI Log

RFI-001, RFI-002 — automatically assigned so nothing gets a duplicate number or falls through.

Status, Priority & Due Dates

Draft → Open → Answered → Closed. Flag priority and set response due dates so overdue items are visible at a glance.

AI-Drafted Responses

AI reads your uploaded spec sections and drawings to prepare a cited draft response — you review and issue. No contractual decisions are made without your sign-off.

Drawing & Spec References

Each RFI captures the affected drawing sheet, grid reference, and specification section so reviewers have full context before reading the question.

From / To Contacts

Track who submitted each RFI, who it was directed to, and who issued the final response — a complete audit trail per item.

RFI Log Export

Export the full RFI log to PDF for owner reporting, subcontractor coordination, or project closeout documentation.

Duplicate Detection

AI checks whether a similar question has already been answered so your team doesn't issue conflicting responses.

Connected to the Project

The RFI log lives alongside daily reports, submittals, punch list, and schedule — context for every open question in one place.

Frequently Asked Questions

What is an RFI in construction?

An RFI (Request for Information) is a formal document used on construction projects to ask the design team — architect, engineer, or owner — a question that cannot be answered from the drawings or specifications alone. RFIs are used to clarify conflicts, missing details, site conditions, or proposed substitutions. Every RFI should be documented with a question, a reference to the affected drawing or spec section, a priority level, a due date for response, and a formal written answer that becomes part of the project record.

How many RFIs does a typical construction project have?

RFI volume varies significantly by project type and complexity. A straightforward commercial fit-out might generate 20–50 RFIs. A mid-size new construction project commonly generates 100–300 RFIs. Large or complex projects — hospitals, labs, mixed-use — can exceed 1,000 RFIs. High RFI volume is often a sign of incomplete design documents, but it can also reflect a thorough site team catching constructability issues early. Either way, managing them in email quickly becomes unworkable above 30–40 open items.

What should every RFI include?

A well-formed RFI should include: a unique RFI number, the date submitted, who submitted it (contractor, sub), who it is directed to (architect, engineer, owner), the affected drawing sheet and revision number, the relevant specification section, a clear question or conflict description, any proposed resolution or substitution the contractor is suggesting, the requested response date, and eventually the formal written response with the same drawing and spec references. Missing any of these fields slows the response cycle and creates disputes at closeout.

How does AI help with RFI responses?

PlanSpan AI reads your uploaded project documents — current drawing revisions, specification sections, addenda, and prior RFI responses — and prepares a structured first draft when a new RFI is logged. The draft includes the relevant spec clause, the applicable drawing reference, and proposed response language. Your project manager or design team reviews the draft, applies their professional judgment, and issues the final response. The AI does not make contractual decisions; it reduces the time spent searching documents from hours to seconds.

Can I export the RFI log?

Yes. PlanSpan exports your full RFI log to PDF — including RFI number, status, submitted date, response date, from/to contacts, drawing and spec references, and full question and response history. The export is formatted for owner reporting, subcontractor distribution, or project closeout documentation.

Is PlanSpan suitable for small contractors who only have a few RFIs per project?

Yes — PlanSpan is built for small to mid-size contractors, not enterprise teams. You do not need a dedicated RFI administrator or a complex implementation. You can start logging RFIs the same day you sign up. Even on smaller projects with 10–20 RFIs, having a numbered log with a clear status and a written response record protects you from disputes and delays final payment.

How is PlanSpan different from Procore or Autodesk for RFI management?

Procore and Autodesk Construction Cloud are broad platforms that cover the whole project and are usually rolled out across a company with setup and training. PlanSpan focuses on RFIs and submittals: when an RFI arrives it drafts the response from your drawings and specifications, cites the sheet and clause it relies on, reminds whoever holds it as the due date nears, and measures turnaround. Nothing is sent until someone on your team approves it, and you can start on one project the same day.

Get started

Track every RFI.Answer it faster.

Start free with one project. PlanSpan drafts each response from your drawings and specifications, and nothing goes out until your team approves it.