RFI Management
Construction RFI Template
Free to download and use, with guidance on how to fill it in.
Download this template
Free to use. No email required.
What it is
A Request for Information (RFI) template provides a standardized format for submitting written questions to the design team on a construction project. A well-structured RFI captures the question clearly, references the affected drawing and specification section, identifies the submitting and receiving parties, sets a required response date, and leaves space for the formal written response. Using a consistent RFI format across your projects makes your log easier to manage, speeds up the review process, and creates a clean audit trail for every design decision.
When to use it
Submit an RFI whenever a conflict, ambiguity, or missing detail in the contract documents requires a formal written direction from the architect, engineer, or owner before field work can proceed. RFIs are appropriate when the drawings conflict with the specifications, when site conditions differ from what the documents show, when a specified product is unavailable and you need direction on an acceptable substitute, or when the design intent of a detail is unclear. Do not use an RFI to document a change order you have already agreed to — that belongs in a change order log. Do not use an RFI as a substitute for reading the documents carefully first.
How to complete it
- 1
Assign an RFI number
Number RFIs sequentially starting from RFI-001. Never reuse or skip numbers. A continuous numeric sequence makes your log easy to follow and prevents duplicate tracking.
- 2
Fill in project and date information
Include the project name, project number, contract number, submission date, and required response date. The required response date should reflect the date by which a response is needed to avoid a field hold, not a generous buffer.
- 3
Identify From and To
Name the submitting company and individual (typically the general contractor or subcontractor's PM) and the receiving party (architect, structural engineer, MEP engineer, or owner's representative).
- 4
Reference the drawing and specification
Identify the affected drawing sheet number, drawing title, revision number, and detail or grid reference. Also identify the applicable specification section number and paragraph. This context is essential for the reviewer — without it, they must search the documents themselves before they can begin answering.
- 5
Write a clear question
Describe the issue plainly and ask a specific question. Avoid vague language like 'please clarify.' State exactly what information you need and why. If you have reviewed the documents and believe there is a conflict, identify both the conflicting references.
- 6
Include a proposed resolution (optional but recommended)
If you have a preferred approach or can see a practical resolution, state it. Design teams are more likely to respond quickly when they can approve a proposed approach rather than having to develop a solution from scratch.
- 7
Attach supporting sketches or photos if relevant
A field photo showing the actual condition, or a marked-up drawing showing the conflict, can cut the response time significantly. If the reviewer can see the problem immediately, they do not need to schedule a site visit before answering.
Common mistakes to avoid
Submitting without reading the documents
Before sending an RFI, search the drawings, specifications, and any addenda for an existing answer. A significant percentage of RFIs ask questions that are already answered in the contract documents. Unnecessary RFIs damage your credibility with the design team and slow response times for everyone.
Vague or compound questions
An RFI that asks multiple questions, or that describes a problem without asking a specific question, is difficult to answer cleanly. Each RFI should contain one clear question. If you have multiple questions, submit multiple RFIs — it is easier to track responses and closes faster.
Missing drawing and spec references
An RFI without document references requires the reviewer to identify the applicable information before they can begin their review. This adds days to the response time. Always include the drawing number, revision, and specification section.
Submitting too late
RFIs submitted after field work has started on the affected area force the reviewer to respond under time pressure and may result in incomplete answers. Submit RFIs as soon as a question is identified — ideally during the pre-construction planning phase for issues visible in the documents.
Not distributing the response to the field
A closed RFI whose answer never reaches the superintendent or foreman is useless. Every approved RFI response should be distributed to everyone responsible for the affected work and filed in the project record.
How PlanSpan automates this workflow
PlanSpan's RFI tracking gives every project an auto-numbered RFI log with status tracking (Draft → Open → Answered → Closed), priority levels, due dates, drawing and spec references, and from/to contact fields — structured exactly like this template, but tracked automatically for the whole team. When an RFI is logged, PlanSpan AI can search your uploaded project specifications and drawings to prepare a cited first-draft response for the design team's review. Every response is stored in the project record and accessible to the full team.