Submittal Management

Construction Submittal LogFree Template & AI Generator

Track every shop drawing, product data sheet, sample, and certificate from submission to approval. Download a free Excel submittal log or generate a complete one with AI in seconds.

What Is a Construction Submittal Log?

A submittal log is the master tracking document for every product data sheet, shop drawing, sample, calculation, and certification required to be submitted for design team review on a construction project.

Every specification section lists the submittals required before materials can be fabricated, procured, or installed. The submittal log captures all of them in one organized register — with status, dates, and review actions — so the project team can confirm that every approval is in place before work proceeds.

A complete submittal log started at project kick-off and actively maintained throughout construction prevents unapproved products from being installed, keeps the procurement schedule on track, and eliminates closeout surprises.

Submittal Number

Spec section + sequential item (e.g. 09-01, 09-02)

Submittal Type

Shop Drawing, Product Data, Sample, Certificate, Test Report, Warranty

Description

Specific item or product being submitted for review

Spec Section

Division and section reference (e.g. 09 21 16 — Gypsum Board Assemblies)

Dates & Review Action

Date transmitted, date returned, Approved / Approved as Noted / Revise & Resubmit

Priority

High (long lead or critical path), Medium, Low

Two Ways to Build Your Submittal Log — Both Free

Download the Free Template

Excel spreadsheet organized by spec section. Columns for submittal number, type, description, spec reference, responsible sub, dates, and review action. Fill it in manually from your specification sections.

  • Pre-formatted columns
  • Status tracking built in
  • Free to use and modify
Download Free Excel Template
Faster Option

Generate with AI

Enter your project type and specification divisions. AI generates a complete, pre-populated submittal log with types, descriptions, reviewers, and priority ratings — ready to download as CSV in seconds.

  • Organized by spec division
  • Shop drawings, product data, samples, certs
  • Export to CSV instantly
Generate Free with AI

Frequently Asked Questions

What is a construction submittal log?

A construction submittal log (also called a submittal register or submittal schedule) is a master tracking document that lists every product data sheet, shop drawing, sample, calculation, test report, and certification required to be submitted for design team review and approval before materials are fabricated, procured, or installed. It tracks the status of each submittal — from preparation through review, approval, and distribution to the field team. A complete submittal log, started at project kick-off and maintained throughout construction, is one of the most effective tools for keeping a project's procurement schedule on track.

What is the difference between a submittal log and a submittal register?

The terms 'submittal log' and 'submittal register' are used interchangeably on most projects. Both refer to the master list of required submittals with status tracking, dates, and review actions. Some organizations use 'submittal schedule' to mean a time-phased version showing when each submittal must be transmitted based on the construction schedule. In practice, most project teams use these terms to describe the same document — the master list with current status for all required submittals.

What should every construction submittal log include?

A comprehensive submittal log should include: a unique submittal number (typically organized by specification section, e.g. 09-01 for the first submittal under Division 09), the submittal type (shop drawing, product data, sample, certificate, test report), a description of the specific item, the specification section reference, the responsible subcontractor, the date transmitted to the design team, the contractual review period, the required approval date based on the construction schedule, the date returned, the review action received (Approved, Approved as Noted, Revise and Resubmit, Rejected), and a notes column for resubmittal tracking.

How is a construction submittal log organized?

Submittal logs are most commonly organized by specification division or section number — Division 03 (Concrete), Division 05 (Metals), Division 07 (Thermal & Moisture Protection), Division 08 (Openings), Division 09 (Finishes), Division 22 (Plumbing), Division 23 (HVAC), Division 26 (Electrical), and so on. Within each division, submittals are numbered sequentially (03-01, 03-02, etc.). This system makes it easy to find all submittals for a specific work type and to confirm, at project closeout, that every specified submittal requirement has been satisfied.

How do you build a submittal log from scratch?

The correct approach is to read every specification section systematically and extract the submittal requirements from the 'Submittals' paragraph in each section. Most specification sections list exactly which submittals are required — product data, shop drawings, samples, calculations, certifications, and any project-specific documentation. Building the log from memory or from a generic checklist is the most common cause of missing submittals at closeout. The AI Submittal List Generator can automate this process — enter your project type and specification divisions and AI generates a complete pre-populated submittal log.

What is the review action 'Approved as Noted' on a submittal?

'Approved as Noted' (also written A/N) means the design team has reviewed the submittal and it is acceptable to proceed, subject to the reviewer's comments. The submitting contractor must review all marked-up comments, incorporate them into the work or materials, and confirm they have done so. 'Approved as Noted' does not require a resubmittal, but the comments are binding. 'Revise and Resubmit' means the submittal contained issues significant enough to require a full revision and re-review before the work can proceed.

Can AI generate a construction submittal log?

Yes. PlanSpan's free AI Submittal List Generator takes your project type and specification divisions as input and generates a pre-populated submittal log organized by spec section, with submittal types, descriptions, recommended reviewers, and priority ratings. The output is ready to export as CSV and import into any project management system or spreadsheet. It typically covers shop drawings, product data, samples, certifications, and test reports for each division you specify.

How does PlanSpan track submittals?

PlanSpan's submittal tracking module gives every project a live submittal register organized by specification section, with status tracking through every stage from Draft to Approved. Submittals are numbered automatically, review actions are recorded with timestamps, and the full resubmittal history is retained for every item. AI can compare submitted product data against your uploaded project specifications to flag discrepancies before the package is transmitted to the design team.

Get started

Track Submittals AutomaticallyWith PlanSpan

PlanSpan's submittal tracking keeps every submittal in a live, auto-numbered register — organized by spec section, tracked through every review action, with AI that checks uploaded product data against your project specifications.