AI Submittal ReviewA First Pass in Minutes, Not Hours
PlanSpan AI compares submitted product data against your specifications, flags deviations and missing documents, and prepares a draft review summary — so your reviewer can focus on the technical decisions, not the manual comparison.

The problem
Why Submittal Review Slows Procurement Down
Comparing Data Sheets to Specs Is Tedious
A single mechanical equipment submittal can have dozens of performance parameters to check against the specification. One reviewer, one spec, hours of manual comparison.
Missing Documents Hold Up Approvals
Submittals often come in incomplete — missing warranties, certifications, or installation instructions. Finding what's missing takes time, and resubmittal cycles add weeks.
Deviations Get Missed
A different motor voltage, a slightly undersized airflow, a substituted fitting material — small deviations are easy to miss in a dense product data sheet, and costly to fix after installation.
What PlanSpan does
AI That Does the First Pass for You
PlanSpan AI reads your project specifications and compares them against submitted product data — automatically extracting key characteristics, identifying gaps, and flagging deviations before your reviewer opens the package.
Spec Comparison
AI extracts key product parameters and compares them directly against your specification requirements.
Missing Document Detection
AI checks the submittal against spec requirements and flags certifications, calculations, or installation details that weren't provided.
Deviation Flagging
Performance differences, substituted materials, and non-compliant dimensions are highlighted before the reviewer starts.
Draft Review Comments
AI prepares a structured review summary with draft comments — compliant items, missing items, deviations, and coordination notes.
How it works
Up and runningon your next project.
- 1
Upload Specs and Submittal
Add your project specification sections and the contractor's submittal package
- 2
AI Runs the First Pass
AI compares product data against spec requirements and identifies gaps, deviations, and coordination issues
- 3
Reviewer Finalizes
Review the AI summary, adjust comments where needed, and issue the official response with your stamp of approval
RFIs and submittals
Related guides
- RFI softwareTrack RFIs from question to closed answer.
- AI RFI draftingDraft clear RFIs from site questions.
- AI RFI responsesCited response drafts from your drawings and specs.
- Submittal trackingSubmittal logs, reviewers and revisions in one place.
- Submittal compliance checksFind missing items before you submit.
- Submittal log guideHow to set up and run a submittal log.
- Free RFI templateA ready-to-use RFI form.
- Free submittal log templateA spreadsheet submittal log.
Get started
Review Submittals FasterWithout Giving Up Control
Start with one project and its drawings and specifications.
