AI RFI Drafting for ContractorsFrom Field Note to Clear RFI
Describe the field issue, attach a photo, or paste a voice note — PlanSpan AI generates a fully structured RFI complete with drawing references, relevant spec clauses, and proposed resolution language. You review and send.

The problem
Why RFI Drafting Slows Projects Down
Writing a Good RFI Takes Time
A well-structured RFI needs a clear description, the right drawing and spec references, a specific question, and a proposed resolution. That takes 20–40 minutes per RFI to do properly.
Poor RFIs Create More Back-and-Forth
Vague questions, missing references, and unclear scope force designers to ask for clarification — which adds days to the response cycle and holds up field work.
Field Teams Don't Have the Specs Handy
A superintendent on site shouldn't need to open a spec binder to write an RFI. But without spec references, the RFI is incomplete and the response takes longer.
What PlanSpan does
AI That Knows Your Project Documents
PlanSpan AI Kickstart reads your uploaded drawings, specifications, and previous RFIs to draft a complete, well-referenced RFI from a field note or voice description — in seconds.
AI Kickstart
Describe the issue in plain language — AI structures it into a complete RFI with references and proposed language.
Spec-Referenced Drafts
AI searches your uploaded project specs to find the relevant clause and cite it in the draft.
Drawing Cross-Reference
AI identifies the affected drawing, grid reference, and detail — so reviewers have the full context immediately.
Human Review Before Send
Every AI draft goes through your review before it's issued — you stay in control of what goes out.
How it works
Up and runningon your next project.
- 1
Upload Your Project Docs
Add your drawings, specifications, and reference documents so AI has project context
- 2
Describe the Field Issue
Type a field note, paste a voice transcription, or describe the conflict in plain language
- 3
Review and Send
AI generates a structured RFI draft — you review, adjust if needed, and issue it through the log
RFIs and submittals
Related guides
- RFI softwareTrack RFIs from question to closed answer.
- AI RFI responsesCited response drafts from your drawings and specs.
- Submittal trackingSubmittal logs, reviewers and revisions in one place.
- AI submittal reviewA first-pass review against the specification.
- Submittal compliance checksFind missing items before you submit.
- Submittal log guideHow to set up and run a submittal log.
- Free RFI templateA ready-to-use RFI form.
- Free submittal log templateA spreadsheet submittal log.
Get started
Send Clearer RFIsand Get Answers Back Sooner
Start with one project and its drawings and specifications.
