Skip to content

Submittal Compliance CheckCatch Spec Deviations Before You Submit

PlanSpan AI reads your project specifications and compares every submittal against them — flagging non-compliant product data, missing certifications, and dimensional conflicts before your reviewer opens the package.

Free plan, no credit card required Nothing is sent without your review
AI submittal compliance check interface
AI compares product data against your specification requirements automatically

The problem

Why Submittal Compliance Issues Slip Through

01

Spec Comparison Is Manual and Slow

Checking a mechanical unit submittal against 15 specification parameters takes an engineer an hour. Multiply that across every equipment package on a commercial project and the hours add up fast.

02

Small Deviations Are Easy to Miss

A 5% airflow shortfall, a different motor voltage, a substituted valve material — these differences are buried in dense product data sheets and easy to miss under time pressure.

03

Non-Compliant Materials Installed Means Rework

A compliance issue caught during review costs a resubmittal. The same issue caught after installation can cost removal, replacement, and delay — often at the contractor's expense.

What PlanSpan does

AI That Reads the Spec and Checks the Submittal

PlanSpan AI extracts performance requirements from your specification sections and compares them against submitted product data — automatically generating a compliance summary that tells your reviewer exactly what passed, what's missing, and what needs a decision.

Spec Parameter Extraction

AI reads your specification sections and identifies every performance requirement, dimensional limit, certification, and reference standard that must be verified.

Product Data Comparison

AI extracts key values from submitted product data sheets and compares them against spec requirements — flagging any item that doesn't meet the stated criteria.

Completeness Checklist

AI checks whether required supporting documents are present — warranties, test reports, energy certifications, stamped calculations — before the technical review begins.

Reviewer-Ready Summary

AI delivers a structured compliance report organizing findings into compliant items, missing documents, deviations, and coordination issues — ready for your professional sign-off.

How it works

Up and runningon your next project.

  1. 1

    Upload Specs and Submittal Package

    Add your project specification sections and the contractor's submitted product data, shop drawings, or cut sheets

  2. 2

    AI Runs the Compliance Check

    AI extracts spec requirements, compares them against submitted data, and flags deviations, missing documents, and coordination conflicts

  3. 3

    Reviewer Acts on the Summary

    Your reviewer reads the compliance report, applies professional judgment to flagged items, and issues the official review action

Get started

Stop Spec Deviations Before They Become Field Problems

Start with one project and its drawings and specifications.