Skip to content

Submittal Tracking SoftwareWith AI That Reads Your Specs

Auto-number submittals, track them from submission to approval, and upload the actual submittal documents — AI reviews them against your project specs and flags discrepancies.

Free plan, no credit card required Nothing is sent without your review
Submittal tracking register
Complete submittal log with status and spec section

The problem

Submittal Management Without a System

01

Submittals Fall Through the Cracks

Tracking submittals in a spreadsheet means you're always one missed cell away from an unapproved product being installed on-site.

02

Reviews Take Days

Reviewing a submittal package against the relevant spec section manually is time-consuming. Meanwhile the contractor is waiting to proceed.

03

No Clear Audit Trail

When a substitution gets approved, you need a record. Email threads and spreadsheets don't give you a defensible history.

What PlanSpan does

A Submittal Log That Thinks With You

PlanSpan gives you a proper submittal register with auto-numbering, status workflow, document uploads, and AI that cross-checks submittals against your spec sections.

Auto-Numbered Register

SUB-001, SUB-002... automatically assigned with spec section and contractor details.

Full Status Workflow

Draft → Submitted → Under Review → Approved / Rejected / Revise & Resubmit.

AI Spec Review

Upload the submittal documents and AI checks them against your spec requirements automatically.

Document Uploads

Attach PDFs and product data sheets directly to each submittal for a complete record.

How it works

Up and runningon your next project.

  1. 1

    Upload Project Specs

    Add your spec sections so AI has the reference documents it needs to review

  2. 2

    Log Submittals As They Arrive

    Create numbered submittals with spec section, contractor, and required dates

  3. 3

    Upload Docs — AI Reviews

    Attach the submittal package and AI checks compliance against your specs in seconds

Get started

Run a Tighter Submittal ProcessStarting Today

Start with one project and its drawings and specifications.