Skip to content
All articles

Technology

Drafting RFIs and Submittal Responses with AI

AI can search thousands of pages, find related records, and produce clear first drafts in a fraction of the time. Here's how to use it on RFIs and submittals without giving up professional judgment.

· 8 min read

Requests for Information and submittals are among the most important — and time-consuming — workflows in construction management. An RFI may begin with a relatively simple field question: a dimension is missing, two drawings conflict, a specified product is unavailable, or the proposed installation cannot be completed as shown. Yet resolving that question may require reviewing drawings, specifications, previous RFIs, site conditions, meeting records, and contractual requirements. Submittal review presents a similar challenge. Product data, shop drawings, samples, calculations, and installation details must be checked against the contract documents before materials are fabricated or installed. When these workflows move slowly, the consequences extend far beyond paperwork — a late RFI response can hold up work in the field, and a missed submittal discrepancy can lead to rework, procurement delays, or installation of a non-compliant product. AI is beginning to change how these documents are prepared and reviewed. Used properly, it can help project teams find relevant information, identify inconsistencies, organize technical content, and produce stronger first drafts. It cannot replace the architect, engineer, contractor, or other professional responsible for the final decision. The best role for AI is not final approval — it is faster, better-informed preparation.

Why RFIs Often Take Too Long

The act of writing an RFI is rarely the most difficult part of the process. The real work is determining what information is actually missing, whether the answer already exists elsewhere, which drawings and specifications are relevant, how the issue affects the work, what decision is required, and whether the question is clear enough to receive a useful response. Poorly drafted RFIs create unnecessary back-and-forth. They may describe the problem without asking a specific question, omit relevant drawing references, combine multiple unrelated issues, or fail to explain the schedule impact. AI can improve this early-stage preparation. A construction-specific AI system can review a field note or subcontractor question and help convert it into a structured RFI containing a concise subject, a clear description of the issue, relevant drawing and specification references, supporting photographs or documents, the specific clarification or direction required, a proposed solution where appropriate, and the date by which a response is needed. Before the RFI is submitted, the system may also search previous RFIs, approved submittals, specifications, and project correspondence to determine whether the answer already exists — preventing duplicate RFIs and reducing unnecessary workload for the design team.

What an AI-Assisted RFI Workflow Looks Like

Consider a superintendent who discovers that a ceiling detail conflicts with newly installed mechanical ductwork. Instead of writing a complete RFI manually, the superintendent records a voice note and attaches site photographs. The AI system can then transcribe and organize the field observation, identify the affected location and building system, search the drawings and specifications for related details, locate previous RFIs or submittals involving the same area, draft a focused description of the conflict, identify the exact decision required, suggest a response deadline based on the planned work, and prepare the RFI for project-manager review. The project manager still verifies the facts, confirms the contract references, and approves the final wording. The value comes from reducing search and drafting time — not from removing professional oversight.

Using AI to Prepare RFI Responses

AI can also support the party responding to an RFI. A response assistant may gather the relevant drawing details, specifications, design notes, previous decisions, and approved substitutions into one review package — then prepare a draft response that restates the question, identifies the controlling documents, summarizes the relevant requirements, notes conflicts or missing information, proposes clear direction, flags issues requiring consultant input, and identifies potential cost or schedule implications. This is especially useful when project information is spread across several systems. However, an AI-generated RFI response must not be treated as an engineering decision merely because it sounds technical and confident. The response may affect design intent, scope, cost, constructability, safety, or contractual responsibility. The person or organization with the required authority must review and issue the final response.

How AI Can Improve Submittal Review

Submittals contain large volumes of technical information. A single equipment submission may include product data, performance tables, dimensions, materials, finishes, electrical characteristics, certifications, installation instructions, warranties, and optional accessories — all of which must be compared against drawings, specifications, schedules, codes, and project-specific requirements. AI can perform much of the first-pass comparison: extracting key product characteristics, comparing them with specification requirements, identifying missing documents, flagging deviations and substitutions, checking model numbers and performance criteria, locating relevant drawing references, and preparing a review summary with suggested comments. For example, if a mechanical-unit submittal lists a different airflow, electrical requirement, or physical dimension than the specification, the AI can highlight the discrepancy immediately. The reviewer can then focus on the technical significance of the difference rather than spending time locating it manually.

Drafting Submittal Responses with AI

AI can help organize a submittal response into a consistent format. A draft response may separate findings into compliant information (requirements that appear to align with the contract documents), missing information (certificates, calculations, samples, warranties, or installation details required but not provided), deviations (differences between the submitted product and the specified requirement), coordination issues (dimensions, connections, clearances, loads, interfaces, or sequencing concerns requiring coordination with other disciplines), and proposed review comments explaining what must be clarified, revised, or resubmitted. This structure allows the design professional, contractor, or reviewer to examine the important issues more quickly. AI may also help distinguish between a routine administrative omission and a potentially significant technical deviation — although that classification must still be verified by an experienced reviewer.

The Importance of Source-Based AI

A general-purpose AI model should not be asked to answer an RFI or review a submittal based only on its general training. Construction requirements are project-specific. A reliable system must retrieve information from the actual project record — including current drawings and specifications, addenda, approved substitutions, previous RFIs, approved submittals, meeting decisions, applicable codes and standards, and contractual roles and approval workflows. This approach is commonly known as retrieval-augmented generation: instead of relying only on what the AI model has learned previously, the system retrieves relevant project documents and uses them to prepare its response. The output should identify the documents and sections on which it relies, allowing the reviewer to verify the source. Without traceable references, a polished AI-generated response may create more risk than value.

What AI Should Not Be Allowed to Do Alone

AI should not independently approve a submittal, reject a proposed product, change the design, interpret contractual entitlement conclusively, accept responsibility for code compliance, commit the owner or contractor to additional cost, issue instructions affecting safety, or sign or seal professional work. These actions involve authority, liability, technical judgment, or contractual consequences. AI can prepare the analysis — a qualified and authorized person must make the decision. Large language models can also generate convincing answers even when information is missing or misunderstood. An incorrect response may result from using an outdated drawing revision, retrieving the wrong specification section, confusing a proposed product with an approved product, missing an addendum, failing to recognize an interface between disciplines, or inventing a reference that does not exist. Construction teams should require every AI-generated draft to show its supporting sources, and reviewers should be able to open the cited drawing, specification, RFI, or submittal directly from the draft. A system that says 'I cannot determine this from the current documents' is safer than one that fills the gap with a plausible-sounding answer.

A Practical Human-in-the-Loop Process

A reliable workflow can be divided into four stages. First, AI preparation: the system searches the project record, extracts requirements, compares documents, and generates a draft. Second, human verification: the assigned reviewer confirms the facts, document revisions, references, technical analysis, and proposed language. Third, authorized decision: the person with contractual or professional authority approves, revises, or rejects the draft. Fourth, controlled issuance: the final response is formally issued through the project-management system, with a record of the documents reviewed and the individuals involved. This approach preserves accountability while capturing the productivity benefits of AI. Before implementing AI-assisted RFI and submittal workflows, organizations should also establish a controlled document repository, reliable drawing and specification revision management, clear user permissions, defined approval authority, standard templates, source citation requirements, audit logs, data-security rules, and a process for reporting incorrect AI outputs. The quality of the AI system will depend heavily on the quality of the project information — if documents are outdated, mislabeled, or incomplete, the AI may accelerate the wrong answer.

Conclusion

AI can significantly improve how construction teams draft RFIs and prepare submittal responses. It can search thousands of pages, find related records, extract technical requirements, compare submitted information, identify missing items, and produce clear first drafts in a fraction of the time required for a fully manual review. But speed is not the same as authority. RFIs and submittals can affect design, scope, cost, schedule, safety, and contractual responsibility — and final responses must remain under the control of the professionals and organizations assigned to make those decisions. The strongest model is AI-assisted review with human accountability. Used that way, AI can reduce administrative effort, shorten response cycles, improve consistency, and allow construction professionals to focus their attention where it adds the most value: understanding the issue and making the right decision.

Your next RFI, already drafted

See it on your own project.

PlanSpan prepares cited RFI responses and first-pass submittal reviews from your own drawings and specifications. Start free with one project.