Mobile Daily ReportsFiled Before You Leave the Gate
Complete your daily report while you walk the site. Capture what happened while it's fresh, attach photos in one tap, and use voice input to log notes hands-free.

The problem
The Problem With End-of-Day Reporting
You Forget the Details
By the time you sit down to write, you've forgotten which subs were on-site, what the weather was at 8am, and who had the safety incident.
Paper Notes Get Lost
Taking notes on paper, photos on your phone, then typing everything up later is triple the work — and things still fall through the cracks.
Reports Stack Up
One missed day becomes two, then five. Catching up on a week of reports is miserable and produces lower-quality records.
What PlanSpan does
Report As You GoFrom Any Phone
PlanSpan is designed for mobile use on the jobsite. Touch-friendly forms, instant photo uploads, and voice logging so you can dictate notes hands-free.
Mobile-First Design
Built for phones and tablets from the ground up. No pinch-zooming a desktop site.
One-Tap Photos
Take site photos and attach them to the current report without leaving the app.
Voice Logging
Speak your notes and AI pre-fills all the report fields for you automatically.
Instant PDF
Generate and share a professional PDF report before you leave the site.
How it works
Up and runningon your next project.
- 1
Open on Your Phone
Access PlanSpan from any mobile browser — no app store download needed
- 2
Log and Snap
Fill out the form and attach photos as you walk the site
- 3
Submit and Share
Generate a PDF and send it to your client before you leave
Daily reporting
Related guides
- Construction daily reportsWhat to record each day and why it protects you.
- Daily report appLog labour, equipment, weather and work from site.
- Voice reportingSpeak a site update and let AI fill in the report.
- Daily report PDFsBranded PDF reports ready to send.
- Daily report software for contractorsReporting built for general and trade contractors.
- AI weekly and monthly reportsTurn daily logs into summaries automatically.
- Free daily report templateA ready-to-use daily report template.
Get started
Start Reporting From the Field Today
Start with one project and its drawings and specifications.
