Skip to content

AI Construction ManagementThat Actually Works on Site

PlanSpan uses AI to write weekly summaries, draft RFI responses, review submittals against your specs, and generate visual proposals — so your team spends less time on documentation and more time building.

Free plan, no credit card required Nothing is sent without your review
AI construction report form
Voice input fills report fields automatically

The problem

Where Construction Teams Lose Time

01

Documentation Eats the Day

Between daily reports, RFI responses, submittal reviews, and weekly summaries, your PMs are spending half their time writing instead of managing.

02

Specs Are Never at Hand

RFI responses require digging through drawings and spec sections. It takes hours to find the answer your contractor needs by end of day.

03

AI Tools Don't Know Construction

Generic AI like ChatGPT doesn't know your project, your specs, or your submittal log. You'd have to paste everything in manually every time.

What PlanSpan does

AI That's Connected to Your Project Data

PlanSpan AI reads your uploaded specs and documents, learns your project, and uses that context to generate accurate responses — not generic filler text.

AI Weekly Summaries

Reads all your daily logs and writes a professional weekly summary automatically.

AI RFI Responses

AI cross-references your uploaded specs to draft accurate RFI responses in seconds.

Voice Logging

Speak your daily notes and AI fills in all the report fields for you hands-free.

AI Visual Proposals

Upload a before photo and AI generates a photorealistic proposed improvement with DALL-E.

How it works

Up and runningon your next project.

  1. 1

    Upload Your Project Docs

    Add specs, drawings, and reference documents to your project

  2. 2

    Log Daily Activity

    Use voice or the form — AI reads everything and builds context over time

  3. 3

    Let AI Draft for You

    Generate RFI responses, submittal reviews, summaries — AI does the heavy lifting

Get started

Put AI to Work on Your Construction Projects

Start with one project and its drawings and specifications.