Billing
Construction Invoice Template
Free to download and use, with guidance on how to fill it in.
Download this template
Free to use. No email required.
What it is
A construction invoice (also called a progress draw or progress billing) is a formal payment request submitted by a contractor or subcontractor to the owner or general contractor at defined intervals — typically monthly — for work completed during the billing period. Unlike a standard service invoice, a construction invoice typically references the schedule of values (a breakdown of the contract price by work component), documents the percentage of each component completed to date, calculates the amount earned in the current period, deducts any contractual holdback, and nets to a payment amount. A clear, well-supported invoice speeds payment and reduces disputes.
When to use it
Submit a progress invoice at each contractual billing period — typically on or before the date specified in the contract (for example, the 25th of each month for payment on the 15th of the following month). The invoice should be supported by documentation that justifies the amounts claimed: a completed schedule of values showing percentage complete for each line item, a written work description summarizing what was performed in the billing period, any lien waivers required by the contract, and any supporting documentation the owner requires. Invoice on schedule, every period, even if the amount is small — gaps in billing complicate the project accounting for everyone.
How to complete it
- 1
Complete the header information
Include your company name, address, GST/HST number, invoice number, invoice date, and billing period. Address the invoice to the correct entity and reference the project name, project number, and contract number.
- 2
Reference the schedule of values
List each line item from the agreed schedule of values. For each item, show the total value, the percentage and dollar amount completed in prior periods, the percentage and dollar amount completed in the current period, and the cumulative total billed to date.
- 3
Calculate the subtotal and holdback
Sum the current period amounts to reach a subtotal. Deduct the contractual holdback percentage (typically 10 percent in Canada) from the subtotal. The result is the net amount payable for the current period.
- 4
Include a work description
Attach a written description of the work performed during the billing period. The work description should be specific enough to justify the amounts claimed — listing the trades that worked, the areas completed, the quantities installed, and any significant milestones reached. A vague description ('labour and materials as per contract') is less convincing than a specific narrative.
- 5
Attach required supporting documents
Include any lien waivers, statutory declarations, or subcontractor certifications required by the contract. Some owners also require daily report summaries, inspection reports, or updated schedules with each invoice.
- 6
Verify the math before submitting
A simple arithmetic error on a construction invoice can delay payment by an entire billing cycle. Check every calculation — percentage completes, current period amounts, cumulative totals, holdback deductions — before submitting.
Common mistakes to avoid
Submitting without a work description
An invoice with no explanation of what was done in the billing period puts the owner in the position of either paying on faith or asking for more information — which delays payment. A work description that summarizes what was performed is the single most effective way to speed invoice approval.
Overbilling percentages without documentation
Claiming that a work component is 80 percent complete when the actual field completion is 60 percent creates a reconciliation problem at project closeout that is difficult to resolve cleanly. Percentage complete claims should reflect actual field progress.
Inconsistent line items between periods
Adding new line items or changing the description of existing line items between billing periods creates confusion for the reviewer. Use the agreed schedule of values consistently throughout the project.
Missing holdback calculations
Forgetting to deduct contractual holdback from the payment amount is an error that will be caught immediately and delay payment while a corrected invoice is prepared. Apply holdback consistently on every invoice.
How PlanSpan automates this workflow
PlanSpan's AI invoice summary tool reads your daily reports for a selected billing period and generates a professional work description narrative — the paragraph that explains to the owner what was done and justifies the amounts being invoiced. Instead of writing the work description from memory at the end of the month, your team types a date range and AI produces a detailed, accurate summary from the actual daily logs. This reduces the administrative time required to prepare a progress billing package and produces a more credible, specific work description than most teams write manually.
See how PlanSpan generates invoice summaries →Download this template
Free to use. No email required.