Skip to content

Construction Estimating SoftwareBuild Estimates Faster, Win More Work

PlanSpan's estimating tools let you structure labour, materials, and subcontract costs in a clean line-item format — then generate a professional proposal PDF to send to clients, all in one place.

Free plan, no credit card required Nothing is sent without your review
Construction estimate line-item builder
Structured line-item estimates for labour, materials, and subcontracts

The problem

Why Estimating Slows Contractors Down

01

Estimates Are Built in Disconnected Spreadsheets

Most contractors build estimates in Excel — which works for the number-crunching, but leaves the estimate completely disconnected from project execution. When something changes in the field, the estimate doesn't update.

02

Proposal Formatting Takes Hours

After the estimate is done, someone still has to format a professional proposal document, add the company logo, write a cover note, and send it. That work takes longer than it should for every bid.

03

You Can't Compare Estimated vs. Actual Costs

Without the estimate and the daily reports in the same system, there's no way to know whether you're tracking to budget until the project is over — and by then it's too late to adjust.

What PlanSpan does

Estimates, Proposals, and Project TrackingAll Connected

PlanSpan puts your estimate in the same platform as your daily reports, RFIs, and submittals. Build the cost breakdown, generate the proposal PDF, win the job, and track actuals against your original estimate — without switching tools.

Line-Item Cost Breakdown

Structure labour by trade, materials by category, and subcontract costs in a clean, organized estimate format that's easy to build and easy to read.

One-Click Proposal PDF

Generate a branded, professional proposal PDF from your estimate instantly — company logo, project details, cost summary, and terms included.

Connected to Your Project

The estimate lives alongside your daily reports, RFIs, and submittals in the same project. No re-entering data when the job is awarded.

AI Invoice Summaries from Actuals

Once the project is running, AI reads your daily logs and writes invoice work descriptions that tie directly back to your original estimated scope.

How it works

Up and runningon your next project.

  1. 1

    Build Your Estimate

    Add labour, material, and subcontract line items with quantities, rates, and markups

  2. 2

    Generate the Proposal

    Click to generate a branded PDF proposal with your estimate summary, company details, and terms

  3. 3

    Win the Job and Track It

    When the project is awarded, your estimate converts to a project — daily logs, RFIs, and submittals connected from day one

Get started

Build Better Estimates and Win More Work

Start with one project and its drawings and specifications.